Cruise vessel project
Costa vessel upgrade during sailing and dry docking in Singapore
1.Pull cable from deck 4 up to deck 11 4G95mm+3G25mm around 200m.
2.Rotex Penetration and related cable way welding.
3.ESD and related fan system installation
4.Galley equipment installation and connection.
5.Lighting system upgrade
6.Smoke detector system modify.
7.Sauna machine install and cable lay
8.Steam machine install and cable lay
9.Colourful LED lighting system upgrade and commissioning.
10.Mozzarella electrical system modify.
11.Foam system modification.
12.Ice creme machine installation.
13.A60 fire door repair.